Project
Peas Samling Nama High School
Project Complete!
Currently, Peas Samling Nama High School both houses and educates 451 students in Nama. While the students remain on campus year round, the water source has a tendency to run dry during the summer months leaving students without a reliable source of clean water.
The limited water supply often leaves staff unable to promote health, hygiene, and the overall function of their facilities to benefit those on campus. By providing Peas Samling Nama High School with a Rainwater Collection System, we will equip students with the most important school supplies: clean water access.
PROJECT PROPOSAL
The Ugandan Water Project, our implementing partner, will erect a 10,000 liter polyethylene tank on a base made of brick, hard core, and cement. Once cured, our crew will then place the tank on the base and make an overflow hole in the top of the structure and attach a pipe to it that will extend six inches beyond the perimeter of the base. Crew members will also attach face boards to the roof of the building adjacent to the tank in order to create a suitable surface to which they can attach the gutters that will allow water to flow from the metal roof to the tank. Just before the outlet pipe reaches the tank, a âTâ joint will be inserted to create a first flush, a rudimentary filtration system that reduces the amount of debris and contaminants that enter the tank. The crew will then construct a protective walk around the tank and first flush, as well as a tap stand located slightly downhill of the tank. The rainwater collection system will be paired with four Sawyer Point One water filters in order to ensure that all water collection from the tank will be safe for drinking.
The Ugandan Water Project, our implementing partner, will erect a 10,000 liter polyethylene tank on a base made of brick, hard core, and cement. Once cured, our crew will then place the tank on the base and make an overflow hole in the top of the structure and attach a pipe to it that will extend six inches beyond the perimeter of the base. Crew members will also attach face boards to the roof of the building adjacent to the tank in order to create a suitable surface to which they can attach the gutters that will allow water to flow from the metal roof to the tank. Just before the outlet pipe reaches the tank, a âTâ joint will be inserted to create a first flush, a rudimentary filtration system that reduces the amount of debris and contaminants that enter the tank. The crew will then construct a protective walk around the tank and first flush, as well as a tap stand located slightly downhill of the tank. The rainwater collection system will be paired with four Sawyer Point One water filters in order to ensure that all water collection from the tank will be safe for drinking.
H2O for Life is not a WASH (water, sanitation and hygiene) project implementer. We have partnerships with non-governmental organizations (NGOs) implementing WASH in Schools projects around the world. Our NGO partners match funds needed for each school project. We also have a generous donor that provides us with an interest-free loan that, along with matching funds, allows for many projects to be started or possibly even completed before total funds have been raised. In rare situations we reserve the right to reallocate funds to alternate project(s).
Questions? Ask us at 651-756-7577 or info@h2oforlifeschools.org.
Project Sponsors
September 22, 2023
Peas Samling Nama Project Complete
The new rainwater collection system at Peas Samling Nama High School in Uganda has been successfully completed!
Our implementing partner, Ugandan Water Project, erected a 10,000-liter polyethylene tank on a base...
Our implementing partner, Ugandan Water Project, erected a 10,000-liter polyethylene tank on a base...