Dynamic Junior School - Replaced by Nativity Junior School
Project Complete!
The Ugandan Water Project, our implementing partner, will erect a 10,000-liter polyethylene tank on a base made of brick, hard core, and cement. Once cured, our crew will then place the tank on the base and make an overflow hole in the top of the structure and attach a pipe to it that will extend six inches beyond the perimeter of the base. Crew members will also attach face boards to the roof of the building adjacent to the tank in order to create a suitable surface to which they can attach the gutters that will allow water to flow from the metal roof to the tank. Just before the outlet pipe reaches the tank, a “T” joint will be inserted to create a first flush, a rudimentary filtration system that reduces the amount of debris and contaminants that enter the tank. The crew will then construct a protective walk around the tank and first flush, as well as a tap stand located slightly downhill of the tank. The rainwater collection system will be paired with four Sawyer Point One water filters in order to ensure that all water collection from the tank will be safe for drinking.
H2O for Life partners with experienced NGO organizations around the world that build and support clean water, sanitation, and hygiene education projects in schools. These NGO partners cover half the total cost of every project funded through H2O for Life.
When students raise money for a project, 90% of the funds go directly to the project, and 10% supports the work that makes the project possible. This includes choosing trusted partners, managing funds responsibly, checking on projects, and reporting back so students can see the impact of their work.
This helps ensure every project is done well, stays sustainable, and truly changes lives.
In rare situations, we reserve the right to reallocate funds to alternate project(s).
Questions? Ask us at 651-756-7577 or info@h2oforlifeschools.org.
Project Sponsors
Nativity Project Complete
- You brought clean water to a school with 13 staff, serving 305 students at the time of project...
